Switching Tester - Model 5780
Technical specifications
- PLC controls the pneumatic cylinder, displays the temperature and includes a counter
- Rated power under normal conditions is 230 VAC and 10 A. Other rated power needs special AC supply (not included)
- When the toaster cut off the current supply after end of the heating test, the Switching Tester will start up a new test
- The first period of test consist of 6 test cycles
- After the 6 test cycles the system will cut of the test so that the toaster is cooling down to room temperature and then the test continues automatically for a new period of 6 cycles
- The test is carried out 500 times (3 000 cycles)
Facts
IEC:
IEC 60335-2-9 Clause 19.101Components:
Weight:
App. 60 kgDimensions:
1200x800x1500 mm (LxWxH)Supply:
230 VAC, 50/60 Hz, 10 A - Air supply 6 barProduct information Switching Tester - Model 5780 (PDF - 191 kb)

